SR 951 Service Volume Study
Collier County, FL — This project involved estimating the maximum service volume for Level of Service E conditions on the portion of SR 951 from SR 84 to City Gate Boulevard N. This existing four-lane roadway is scheduled to be widened to eight lanes in the near future. AIM staff conducted a series of traffic analyses using the SYNCHRO and SIMTraffic software to estimate this new maximum service volume.
About this entry
- You’re currently reading “SR 951 Service Volume Study,” an entry on AIM Engineering & Surveying, Inc.
- Published: 11.24.09 / 12pm
- Category: Services, Transportation Planning
- Tags:
