South Dixie Highway (SR 805)
 

Dixie Highway is a 4-lane undivided highway with 11-foot thru lanes and an 8-foot parking lane on both sides. This project includes many improvements to Dixie Highway (SR 805) from Southern Boulevard to Belvedere Road (FIN 415312-1-52-01).

Project Details:

  • Cost: $1,086,777.99
  • Length: Approximately 1 mile
  • AADT = 24,000
  • Letting Date: 08/26/2009
  • Award Date: 09/15/2009
  • Executed Date: 09/28/2009
  • Notice to Proceed: 10/27/2009
  • Anticipated Start Date: 04/12/2010
  • Contract Duration: 265 calendar days
  • Current finish date: 01/3/2011

 

The checklist for this project includes variable depth milling and resurfacing of the asphalt pavement, and replacement of existing damaged curbs, sidewalks and inlet tops. It will also upgrade the pedestrian curb ramps for ADA compliance as well as the signing and pavement markings to meet RRR criteria.

Click here to view pictures of the project

 
About this entry
  • You’re currently reading “South Dixie Highway (SR 805),” an entry on AIM Engineering & Surveying, Inc.
  • Published: 6.1.10 / 3pm
  • Category: CEI, Services
  • Tags:
 

About

Our services include:

  • Transportation Planning
  • Project Development Studies
  • Natural Environmental Services
  • Survey and Right-of-Way Mapping
  • Geographic Information Systems (GIS)
  • Subsurface Utility Engineering (SUE)
  • Civil Engineering including: roadway, drainage structures and traffic design
  • Land Development
  • Water Resources and Utilities
  • Environmental and Water Management Permitting
  • Construction Management and Inspection
  • Public Outreach/Information

Monthly Archives